Design and Inspection Training

for Package Wastewater Treatment Facilities

The pollution rate of our surface, underground and sea waters is increasing every year with negative effects on public health and the environment. In regions, where central wastewater treatment and sewage systems are not available, the design, operation, maintenance and control of package treatment plants are of great importance.

Join this special training organized by the Environment for Cyprus project in cooperation with the Chamber of Environmental Engineers and increase your competencies in wastewater management!

Key Details

Training Dates
22 and 30 January 2025 (technical training sessions) * Technical site visits will take place in February
Venue
KTOS (new building), Nicosiaχάρτης
Deadline to Apply
16 January 2025
Target Participants
Environment professionals
Contact
+90 533 867 46 22 | info@env4cyp.eu
Language
English (simultaneous translation to Turkish will be provided)
Notes
Limited spaces available

Επισκόπηση

This training aims to strengthen the capacities of engineers and environmental professionals involved in the design, operation and inspection stages of package wastewater treatment plants. This 4-day training will include technical information about legal legislation, different treatment technologies, creating and executing detailed inspection plans, and technical field trips. Certificates will be presented to the participants.

Design and Inspection Training for Package Wastewater Treatment Facilities
Κάντε αίτηση τώρα
Application deadline:
16 Jan 2025